One of the most common questions our customers ask is, “How long will my project take to build?” The answer, unfortunately, isn’t an easy one to calculate without first digging into some details. If you have a desired completion date in mind, you’ll be able to work backward in developing a timeline, but there are many factors to consider.

Complexity and size are the most important elements in estimating a build time. A simple residential garage or machine shed can be built in just a few days, whereas a large, complex project like a commercial event center or Barndominuim/Shome® can take 3 to 6 months or more.  There are many things to consider outside of the actual physical build time that can impact the overall time it takes to complete a project:

Building Location & Site Condition 

Is the site level? Is the pad prepared that the building will sit on? How well does the site drain? Are there overhead obstacles like power lines and trees? Is there an existing safe working apron around the site? Just getting the site ready for construction will take time.

Crew Availability 

By scheduling sooner than later, and early before the peak building period in spring and summer, you can get a jump on other customers in the line. If subcontractors are needed for items like concrete, electrical, plumbing and HVAC, your project schedule will have to incorporate them as well.

Weather 

Mother Nature will definitely have her say in how long your post-frame construction project will take. Once a construction project gets going and significant progress is made on items like exterior walls and the roof, weather will become less of a factor. But ice, snow, rain and mud can all add to the overall timeline of your project.

Material Delivery Schedules 

Construction materials will need to be delivered and that can take anywhere from a few days to several week. You’ll want to plan accordingly. There earlier they can be ordered, the less likely you are to experience delays.

Design Services 

Working with your builder to make all the decisions necessary to start a project will take some time. Developing the initial design, choosing your colors and finishes, and completing a final architectural layout can take a few days or even weeks. Making any changes to the design by adding features like doors, windows, porches will require a Change Order and will also add to the overall timeline.

Architectural and Engineering Approvals

If your project is a living dwelling or commercial space, you’ll need to get stamped plans. This process can take several weeks to get completed.

Permitting & Inspections 

The type and number of permits and inspections required for your project will obviously depend on your local codes and building authorities. You’ll want to get started early to understand the rules governing your location and avoid construction delays.

Financing 

If you need to finance your project with a loan, it can take a few weeks to several months selecting and working with a bank to secure the funds.

As you can see, there are many factors to consider beyond the actual physical work of building your project. Working through the process with your builder means getting started sooner than later if you want to meet a desired completion date.